On Friday morning, September 18 the large crane was moved in to position at the marina and the 52 was readied for hoisting. At 1030 hours the load was turned over to the Marina travel lift and the recovery was complete.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment